How to Install Damp Proof Course (DPC) in Brickwork
This guide details the correct installation of a Damp Proof Course (DPC) in brickwork, a critical barrier designed to prevent rising damp from ground moisture. Proper DPC installation is essential for the longevity and structural integrity of any masonry structure, complying with AS 3700 Masonry Str
- Skill level
- Intermediate
- Time
- ~2-4 hours per 10 linear metres
- Trade
- Building & Construction
- Updated
- 30 October 2026
Tools you will need
- Brick Trowel: For applying mortar.
- Tape Measure: 5m or 8m for accurate measurements.
- Utility Knife/Snips: For cutting DPC material.
- Rubber Mallet: For adjusting bricks.
- Mortar Board/Wheelbarrow: For mixing and holding mortar.
- Bucket: For water.
- Jointer/Pointing Tool: For finishing mortar joints.
🧱 Installing Damp Proof Course (DPC) in Brickwork
What is the purpose of a Damp Proof Course (DPC) in Australian brickwork?
This guide details the correct installation of a Damp Proof Course (DPC) in brickwork, a critical barrier designed to prevent rising damp from ground moisture. Proper DPC installation is essential for the longevity and structural integrity of any masonry structure, complying with AS 3700 Masonry Structures.
What skill level is required to install DPC in brickwork?
Intermediate — Estimated time: ~2-4 hours per 10 linear metres
What tools are essential for DPC installation in brickwork?
Brick Trowel: For applying mortar. Spirit Level: 600mm and 1200mm for checking level. Tape Measure: 5m or 8m for accurate measurements. Utility Knife/Snips: For cutting DPC material. Line Pins & String Line: For maintaining straight and level courses. Rubber Mallet: For adjusting bricks. Mortar Board/Wheelbarrow: For mixing and holding mortar. Bucket: For water. Jointer/Pointing Tool: For finishing mortar joints.What materials are needed for DPC installation in Australia?
Damp Proof Course (DPC) Material: Polyethylene or bituminous felt, minimum 300mm wide (or wider than the wall thickness). Ensure it meets AS/NZS 2904. General Purpose Mortar Mix: 1:2:9 (cement:lime:sand) or 1:1:6 (cement:lime:sand) for strength and workability. Bricks: As per project specifications.What safety precautions are mandatory when installing DPC?
⚠️ Safety
PPE: Safety glasses, gloves, steel-capped boots are mandatory. Manual Handling: Use proper lifting techniques when handling bags of cement or bricks. Work at a comfortable height to minimise bending. Scaffolding: For walls exceeding 1.2m in height, appropriate scaffolding must be erected and inspected as per AS/NZS 1576.1. Dust Control: Wear a P2 mask when mixing dry mortar to prevent inhalation of silica dust.Step-by-Step Guide
How do you prepare the foundation for DPC installation?
1️⃣ Clean and Level Foundation: Ensure the top of the concrete footing or slab is clean, free of debris, and level. Any irregularities greater than 5mm should be rectified with a levelling bed of mortar.
2️⃣ Establish Datum Line: Mark a datum line on the foundation, typically 150mm above finished ground level (FGL), to indicate the DPC height. This ensures compliance with BCA requirements for DPC placement.
3️⃣ Lay First Mortar Bed: Apply a full bed of mortar, approximately 10-12mm thick, along the entire length of the wall where the DPC will be laid. Ensure the bed is level and consistent.
Step 2: Position and Lay the DPC
1️⃣ Cut DPC to Length: Unroll and cut the DPC material to the required lengths, allowing for overlaps at corners and joins. The DPC must extend the full width of the wall, including any render or finish, typically 150mm above FGL.
2️⃣ Lay DPC on Mortar Bed: Carefully lay the DPC material onto the wet mortar bed. Ensure it is flat, without creases or folds. The DPC must project slightly beyond the face of the brickwork to prevent moisture bridging.
3️⃣ Overlap and Seal Joins: At joins, overlap the DPC by a minimum of 150mm and ensure it is fully bedded in mortar to create a continuous barrier. For corners, the DPC should be folded or cut and overlapped to maintain continuity.
Step 3: Lay the Mortar Bed Over DPC
1️⃣ Apply Second Mortar Bed: Immediately apply another full bed of mortar, approximately 10-12mm thick, directly on top of the DPC. This bed will receive the first course of bricks above the DPC.
2️⃣ Ensure Full Coverage: The mortar bed must fully cover the DPC to prevent it from being punctured or damaged by the bricks.
Step 4: Lay Bricks Above DPC
1️⃣ Lay First Course of Bricks: Carefully lay the first course of bricks onto the mortar bed above the DPC. Use a string line and spirit level to ensure they are perfectly level and plumb.
2️⃣ Maintain Mortar Joints: Ensure consistent 10mm mortar joints. Tap bricks gently with a rubber mallet to adjust their position.
3️⃣ Tool Joints: Finish the mortar joints with a jointer or pointing tool for a neat and weather-tight finish.
Step 5: Inspect and Protect
1️⃣ Inspect DPC Continuity: Visually inspect the entire DPC installation to ensure there are no gaps, tears, or areas where it has been bridged by mortar.
2️⃣ Protect DPC: During subsequent construction, protect the exposed DPC from damage. Ensure no debris or mortar falls onto the DPC, creating a bridge for moisture.
3️⃣ Flashing Integration: Where the DPC meets door or window openings, ensure proper integration with flashing details to maintain a continuous moisture barrier. This often requires a stepped DPC.
Common Mistakes to Avoid
Pro Tips
💡 Mortar Consistency: Use a slightly stiffer mortar mix for the bed directly under and over the DPC to prevent it from squeezing out excessively and potentially bridging.
💡 Pre-cut DPC: For long runs, pre-cutting DPC sections can improve efficiency and reduce waste.
💡 Temporary Weight: For windy conditions, place a few bricks on the laid DPC to prevent it from lifting before the next mortar bed is applied.
💡 Visual Check: Always step back and visually inspect the DPC line from a distance to ensure it is straight and level before laying bricks.
💡 Integrated Flashing: For cavity walls, ensure the DPC is integrated with cavity flashings at openings to direct water out of the cavity.
Recommended Tools
🔧 Brick Trowel: Look for a 10-11 inch London pattern trowel for good balance and mortar capacity.
🔧 Spirit Level: A good quality 1200mm box-section level for accuracy over longer runs.
🔧 Line Pins & String Line: Essential for maintaining straight and level courses; opt for durable, non-stretch string.
🔧 Utility Knife with Snap-Off Blades: For clean, precise cuts of DPC material.
Frequently asked questions
- What is involved in install damp proof course (dpc) in brickwork?
- This guide details the correct installation of a Damp Proof Course (DPC) in brickwork, a critical barrier designed to prevent rising damp from ground moisture. Proper DPC installation is essential for the longevity and structural integrity of any masonry structure, complying with AS 3700 Masonry Str
- What skill level do I need for install damp proof course (dpc) in brickwork?
- Intermediate — Estimated time: ~2-4 hours per 10 linear metres
- What are common mistakes when install damp proof course (dpc) in brickwork?
- 1. Bridging the DPC: Allowing mortar droppings or debris to fall onto the DPC, creating a path for moisture to bypass the barrier. 2. Incorrect Height: Installing the DPC too low (below 150mm FGL) or too high, rendering it ineffective. 3. Damaged DPC: Puncturing or tearing the DPC during installation or subsequent work, creating a breach in the barrier. 4. Insufficient Overla
- What tools do I need for install damp proof course (dpc) in brickwork?
- This guide includes a comprehensive tools list. Key building & construction tools are detailed in the Tools Required section.
- What is the Australian standard for DPC installation?
- The primary Australian standard for DPC installation is AS 3700:2018 Masonry Structures, which specifies requirements for DPC placement and materials. Additionally, AS/NZS 2904:1995 outlines the specifications for damp-proof courses and flashings themselves. Always refer to the latest editions for compliance.
- How high should a DPC be installed above ground level in Australia?
- In Australia, the DPC must be installed at a minimum height of 150mm above the finished ground level (FGL) to effectively prevent rising damp. This requirement is stipulated in AS 3700:2018 Masonry Structures to ensure adequate protection against moisture ingress.
- What DPC materials are compliant with Australian standards?
- Compliant DPC materials in Australia include polyethylene and bituminous felt, provided they meet the specifications of AS/NZS 2904:1995. These materials must be durable, impermeable, and resistant to chemical degradation from mortar. The DPC width should always exceed the wall thickness.
- What is the recommended mortar mix for bricklaying with DPC?
- For bricklaying with DPC, a general-purpose mortar mix of 1:2:9 (cement:lime:sand) or 1:1:6 (cement:lime:sand) is recommended in Australia. This mix provides good strength and workability, ensuring proper adhesion and structural integrity for the brickwork above and below the DPC.
Written by Bricko, the Building & Construction specialist at QLD.Tools.