How to install artificial grass in your backyard

Install artificial grass correctly by excavating 100mm, compacting road base and crusher dust, then securing turf with joining tape and silica sand infill.

Quick answer

To install artificial grass in Australia, excavate 100 mm to 125 mm of soil, screed a dual-layer base of compacted road base and crusher dust, then lay turf sheets with matching pile directions. Fasten perimeter edges with 150 mm galvanised spiral pins and distribute 10 kg to 15 kg per square metre of silica sand infill.

Skill level
Intermediate
Time
2–4 days for 30–50 m²
Trade
Earthmoving & Landscaping
Updated
8 November 2026

Tools you will need

  • Kubota KX018-4 - 1.7t Mini Excavator with Mud Bucket
  • Bluebird SC18 - Petrol Sod Turf Cutter
  • Wacker Neuson VP1550 - Petrol Vibratory Plate Compactor
  • Topcon RL-H5A - Self-Levelling Rotary Laser Level
  • Selleys 420g Liquid Nails Direct Stick or Turf Adhesive - Synthetic Grass Adhesive
  • Marshalltown 6mm - V-Notched Adhesive Trowel
  • Stanley 10-099 - Classic Heavy-Duty Retractable Utility Knife
  • Scotts Handy Green II - Handheld Sand Infill Drop Spreader

How do you install artificial grass in an Australian backyard?

🏗️ How to Install Artificial Grass in Your Backyard

Artificial grass performs best when installed over a free-draining, accurately graded and well-compacted base—not directly over soil or existing lawn. This guide covers excavation, drainage, base preparation, cutting, joining and infilling for a typical Australian backyard, with allowances for pets, heavy rain and drought-prone conditions.

Skill Level

Intermediate — Estimated time: 2–4 days for 30–50 m²

What tools and excavation machinery are required to lay synthetic turf?

🔧 Equipment Required

1.7–2.5 t mini excavator with mud bucket for areas larger than 40 m² or where substantial excavation is required
Turf cutter for removing established lawn cleanly
Mini skid steer or tracked loader for moving spoil and road base
Laser level, rotary laser or string line with spirit level
60–90 kg reversible plate compactor; use a smaller 40–60 kg plate where access is restricted
Landscape rake, shovel, mattock, wheelbarrow and screed rails
Heavy-duty utility knife with hooked turf blades
Artificial-grass carpet kicker or stretcher
Joining tape, adhesive spreader and caulking gun
Stiff-bristled power broom or mechanical turf brush
Tape measure, chalk line, straightedge and marker
Hose with adjustable spray nozzle
Rubber mallet and club hammer
PPE: safety boots, gloves, safety glasses, hearing protection, P2 dust mask, sun protection and high-visibility clothing

💡 For a one-off backyard, hiring a turf cutter and compactor is generally cheaper than buying. Purchase becomes worthwhile when completing several projects or ongoing property maintenance; machinery costing more than $20,000 may be financed through Local Knowledge Finance, subject to approval.

What base materials and sub-base depth do you need for synthetic turf?

Quantities below should be calculated from the finished lawn area, allowing for compaction, cuts and wastage.

Artificial grass: finished area plus 5–10% waste; order rolls from the same production batch
Geotextile separation fabric: lawn area plus 150–300 mm overlaps
Crushed rock or road base: enough for 60–80 mm compacted depth
Approximate quantity: area × compacted depth × 1.15–1.25 compaction allowance
Crusher dust, decomposed granite or approved turf fines: 10–20 mm compacted depth
Perimeter restraint: treated timber, concrete edging, aluminium edging or pavers
Galvanised turf nails or U-pins: generally 150–300 mm centres around edges and 300–500 mm centres internally, subject to manufacturer instructions
Artificial-grass joining tape and outdoor polyurethane turf adhesive
Kiln-dried silica sand or manufacturer-approved infill: commonly 5–10 kg/m²
Pet deodorising or antimicrobial infill where required
100 mm slotted ag pipe, drainage aggregate and filter sock where subsoil drainage is needed
Stormwater fittings where drainage is connected to an approved legal point of discharge
Herbicide, only if required and used strictly according to the label
Optional concrete haunching for high-traffic edges

Safety Requirements

⚠️ Safety

📞 Dial Before You Dig (1100) before any excavation, pegging, trenching or use of ground anchors. Review plans and physically locate services using safe methods; plans alone do not confirm exact depth or alignment.
Check for private services not normally shown on utility plans, including irrigation, pool plumbing, garden lighting, septic systems and owner-installed electrical cables.
Obtain council or water-authority approval before changing stormwater discharge, connecting subsoil drainage or significantly altering site levels.
Do not direct runoff onto neighbouring properties, buildings or public land. Drainage work should comply with local authority requirements and applicable parts of AS/NZS 3500.
Confirm whether excavation may affect retaining walls, footings, easements, trees or boundary structures. Engage a qualified contractor or engineer where support could be compromised.
Use mechanical lifting assistance for turf rolls; large rolls are awkward and can cause back injuries.
Wear a P2 dust mask, eye protection and hearing protection while cutting, compacting or handling dusty base products.
Keep hands and feet clear of compactors, turf cutters and loaders. Only trained operators should use powered earthmoving equipment.
Avoid operating machinery on steep, wet or unstable ground.
Use outdoor-rated adhesives in ventilated conditions and follow the product Safety Data Sheet.
Artificial grass can become very hot in direct sun. Wear gloves and knee protection, and prevent children or pets from using overheated surfaces.
Confirm the selected product meets any applicable bushfire, pool-surround and building requirements. Turf near buildings in bushfire-prone areas may require specific fire-performance documentation.

Step-by-Step Guide

Step 1: 1️⃣ Plan the Area and Check Drainage

Measure the lawn at its longest and widest points, then draw a scaled plan showing buildings, paths, garden beds, drains, trees and service locations. Plan roll layouts so the pile runs in the same direction across every piece, preferably facing the main viewing position.

Set the finished level below adjoining surfaces:

10–15 mm below paving for general landscaping
15–25 mm below thresholds where wind-driven rain may be an issue
Flush or slightly low at paths to avoid a trip edge

Provide a consistent fall of approximately 1–2%, equal to 10–20 mm per metre, away from buildings. For clay, flat or regularly waterlogged sites, include subsoil drainage rather than relying only on surface fall.

💡 Lay out the turf according to available roll widths, commonly 3.7 m or 4 m, to reduce seams and waste.

Step 2: 2️⃣ Remove Existing Turf and Excavate

Cut existing lawn into manageable strips with a turf cutter, then remove roots, organic matter, loose soil and debris. Do not bury old lawn beneath the new base because decomposing material will settle and create soft spots.

Excavate enough material to accommodate:

60–80 mm compacted road base
10–20 mm compacted finishing layer
Artificial-grass backing and pile
Any required clearance below adjacent paving

A typical total excavation depth is 80–110 mm, but soft clay, poor fill or vehicle loading may require deeper excavation and professional assessment.

For areas under approximately 30–40 m², manual removal or a hired turf cutter is usually economical. For larger areas, difficult access or deep cuts, hire a 1.7–2.5 t mini excavator or mini loader with an operator.

Stockpile reusable topsoil separately from turf and contaminated fill. Arrange lawful disposal before starting, as excavated soil expands and often occupies 20–30% more volume once loosened.

Step 3: 3️⃣ Prepare and Compact the Subgrade

Shape the exposed soil to the planned fall and remove soft, pumping or saturated sections. Replace weak areas with compactable granular material rather than covering them with additional fines.

Lightly moisture-condition the subgrade and compact it using a plate compactor. The surface should feel firm underfoot without visible movement or deep footprints.

Install geotextile fabric over soft clay, reactive soil or mixed fill to stop the road base migrating into the subgrade. Overlap joints by 150–300 mm and turn the fabric slightly up perimeter edges.

Do not place an impermeable plastic weed barrier beneath the turf. It can trap water and cause odour, movement and base failure.

Step 4: 4️⃣ Install Drainage Where Required

If the subgrade drains poorly, excavate drainage trenches with a minimum practical fall toward an approved outlet. A common residential arrangement uses 100 mm slotted ag pipe surrounded by clean drainage aggregate and wrapped with filter fabric or installed in a filter sock.

Place drains at low points and along areas where water naturally collects. Do not connect ag pipe to sewer systems, and do not discharge water onto neighbouring land.

Surface drains may be needed beside paving, retaining walls or covered entertaining areas. Set pits and channel drains to finished levels before placing the turf base.

💡 Test drainage by lightly hosing the shaped subgrade. Water should move toward the intended outlet without persistent ponding.

Step 5: 5️⃣ Install Perimeter Restraints

Fit solid edging around the lawn to contain the granular base and provide a secure fixing point. Suitable options include:

Treated H4 timber suitable for ground contact
Concrete mowing strips or kerbs
Pavers on a stable concrete or mortar bed
Aluminium or proprietary synthetic-turf edging

Set edging to the planned finished level and anchor it firmly. Curved edges must be smooth and well supported so the turf does not pull away over time.

Keep timber clear of permanent saturation and use compatible galvanised or stainless fixings in coastal or corrosive environments.

Step 6: 6️⃣ Place and Compact the Road Base

Spread crushed rock or road base in layers no thicker than approximately 50 mm loose depth. Grade each layer with a rake or screed before compaction.

Lightly mist the material with water—damp, not saturated—and compact it using overlapping passes. Change direction between passes and pay particular attention to edges, corners and around pits.

Build the base to a compacted depth of 60–80 mm for pedestrian areas. Weak subgrades or higher loads may require 100 mm or more, based on site conditions.

Check levels with a laser or string line after each layer. Maintain a finished fall of 1–2% and remove any high spots rather than trying to hide them with the turf.

💡 The compactor should stop leaving visible wheel or plate marks once the base has reached suitable density.

Step 7: 7️⃣ Apply the Finishing Layer

Spread 10–20 mm of crusher dust, decomposed granite or manufacturer-approved turf fines over the compacted road base. Screed it smooth using straight rails or a long aluminium screed.

Lightly water and compact the layer, then fill small depressions and compact again. The finished surface should be firm, smooth and free of stones, ridges and footprints.

Use a straightedge to check for hollows. Variations that look minor on the base often become obvious after low-angle sunlight reaches the finished grass.

Do not use loose brick sand as the primary base. It can shift, retain excessive moisture and develop footprints or ripples.

Step 8: 8️⃣ Acclimatise and Position the Turf

Roll the artificial grass out on a clean, flat surface and allow it to relax for several hours; overnight is preferable in cool weather. Avoid folding the product because creases can be difficult to remove.

Position each roll with the pile leaning in the same direction. Leave enough material around edges for final trimming and avoid dragging the backing across sharp gravel or dirty ground.

If multiple pieces are required, position factory edges close together without overlap. Check colour, pile direction and batch consistency before cutting.

Step 9: 9️⃣ Cut and Join the Seams

Fold back both edges and trim along the backing rows with a sharp hooked blade. Cut from the backing side and avoid slicing through the grass fibres.

Place joining tape centrally beneath the seam, adhesive side up where self-adhesive tape is used. Otherwise, spread outdoor turf adhesive evenly according to the manufacturer’s coverage rate.

Bring both edges together, leaving a consistent gap matching the natural stitch spacing. Do not overlap the backing or force the seam tightly enough to create a raised ridge.

Press the seam firmly, weight it with clean boards or sandbags and allow the adhesive to cure. Keep traffic off the seam for the specified curing period.

💡 Keep grass fibres out of the adhesive using a stiff brush or temporary masking strip. Trapped fibres make seams more visible.

Step 10: 🔟 Trim and Secure the Perimeter

Trim the turf gradually against edging, walls and garden beds. Make several shallow cuts rather than one aggressive cut, particularly around curves.

Pull the turf flat without overstretching it. Secure the perimeter using galvanised nails, screws with washers or turf pins at approximately 150–300 mm centres, following the turf supplier’s instructions.

Position fixings between stitch rows and brush fibres over the heads. Add fixings at corners, curves and changes in direction, but avoid unnecessary internal pinning that may become visible.

Do not fix turf directly into loose soil. Fixings must engage with a stable edge or well-compacted base.

Step 11: 1️⃣1️⃣ Apply Infill and Brush the Pile

Confirm the turf manufacturer’s infill requirements. Spread kiln-dried silica sand or approved infill in several light applications rather than one heavy layer.

A typical application is 5–10 kg/m², although pile height, density and intended use will change the required quantity. Keep the turf dry so the infill falls between fibres instead of clumping on top.

Brush against the pile direction after each application using a stiff broom or mechanical power brush. The infill should settle into the lower pile while the fibre tips remain exposed.

For pets, use a low-odour, antimicrobial or zeolite-based product approved for artificial turf. Avoid unsuitable sharp or dusty sand.

Step 12: 1️⃣2️⃣ Inspect, Clean and Maintain

Remove offcuts, loose fibres and excess infill. Hose lightly to remove dust and verify that water drains without ponding.

Check that:

Seams are flat and securely bonded
Edges cannot be lifted
Drainage pits remain accessible
The pile stands evenly
No sharp fixings are exposed
Surface levels do not direct water toward the house

Brush high-traffic areas every few months and top up infill as required. Remove leaves regularly, rinse pet areas promptly and use only cleaners approved by the turf manufacturer.

Avoid placing hot barbecues, reflective glass, fire pits or vehicle exhausts directly near the turf. Heat can melt or distort synthetic fibres.

Common Mistakes to Avoid

1.Installing over existing lawn: Organic material decomposes and causes settlement, weeds and uneven areas.
2.Using insufficient base depth: A thin or poorly compacted base develops footprints, ripples and low spots.
3.Ignoring drainage: Artificial grass is permeable, but water still needs a graded base and lawful discharge point.
4.Mismatching pile direction: Joining sections with opposing grain makes colour differences and seams highly visible.
5.Overtightening seams or edges: Excessive tension can cause ridges, shrinkage and lifted edges during hot weather.

Pro Tips

💡 Order all turf from the same batch to minimise shade and texture differences.
💡 Carry out excavation and base preparation in dry weather, but install the turf on a mild day so the backing is easier to handle.
💡 Hire a 60–90 kg reversible plate compactor for larger areas; buying is generally justified only for repeated projects.
💡 Use a laser level for areas above 30 m². Accurate grading saves more time than repeatedly correcting the base by eye.
💡 Keep spare turf, infill and the product batch details for future repairs. Store offcuts flat or loosely rolled, never folded.

Recommended Tools

🔧 Recommended Equipment

Red Roo or equivalent turf cutter — fast, consistent removal of established lawn
Wacker Neuson, Mikasa or Husqvarna 60–90 kg plate compactor — reliable compaction for residential turf bases
1.7–2.5 t Kubota, Yanmar or Takeuchi mini excavator — suitable for larger excavations and restricted-access yards
DeWalt, Bosch or Topcon rotary laser level — establishes accurate 1–2% drainage falls
Wolff or Roberts artificial-turf seam cutter and carpet kicker — cleaner joins and controlled final positioning

For machinery purchases above $20,000, consider equipment-finance options through Local Knowledge Finance; for a single backyard installation, short-term hire will usually provide better value.

Frequently asked questions

What base material is best for artificial grass in Australia?
The best base for artificial grass is 75 mm to 100 mm of compacted Class 2 road base, topped with 20 mm to 25 mm of crusher dust or blue metal dust. This combination provides a solid, rut-resistant foundation that drains freely and levels accurately prior to synthetic turf installation.
How deep do you need to excavate for artificial grass?
You must excavate between 100 mm and 125 mm below your finished boundary height. This depth accommodates an 80 mm compacted road base sub-layer, a 20 mm crusher dust screed, and the synthetic turf backing, ensuring the grass blades finish approximately 10 mm to 15 mm above adjacent paved borders.
Do you need council approval for synthetic turf in Australia?
Council approval is rarely required for artificial grass on private residential land, provided overland stormwater flow is not diverted onto neighbouring blocks. However, property owners must comply with local council development control plans regarding minimum deep-soil permeability quotas, which frequently mandate 20% to 30% of the site remain naturally permeable.
How much sand infill does synthetic grass need per square metre?
Synthetic grass requires between 8 kg and 15 kg of dry silica sand per square metre, depending on blade pile height. Applying Australian-standard 30/60 washed and dried silica sand weighs down the turf backing, protects the latex layer from UV degradation, and holds the yarn blades vertically upright.
Can you lay artificial grass directly on dirt or existing lawn?
No, artificial grass must never be installed directly over existing soil or turf. Natural lawn decomposes, creating an unstable, uneven surface prone to sinkholes, poor drainage, and weed penetration. A minimum 100 mm dual-layer excavated sub-base using compacted aggregate is essential to prevent structural failure.
How do you join artificial turf seams correctly?
Artificial turf seams are joined by trimming three tuft rows off adjoining factory edges to ensure clean backing lines. Align the pieces with a 2 mm to 3 mm gap, peel back the edges, position exterior-grade synthetic turf joining tape centrally, and apply polyurethane adhesive using a notched trowel.

Written by Digger, the Earthmoving & Landscaping specialist at QLD.Tools.