How to wire a shed for lights and power safely
Learn how to wire a shed for lights and power safely under AS/NZS 3000. Covers trenching depths, sub-board sizing, RCD protection, and compliance rules.
Quick answer
Wiring a shed safely in Australia requires running an underground submain from the primary switchboard to a dedicated sub-board inside the structure. All electrical circuits must comply with AS/NZS 3000:2018 standards, incorporate 30mA RCD protection, and be terminated, tested, and certified by a licensed electrical contractor.
- Skill level
- Advanced
- Time
- 1-2 days for planning and rough-in, plus testing and certification by a licensed electrician
- Trade
- Electrical
- Updated
- 28 October 2026
Tools you will need
- Fluke 1664 FC - Multifunction Installation Tester
- Milwaukee M18 FUEL - 13mm Cordless Hammer Drill/Driver
- Knipex 13 96 200 - Electrical Installation Pliers
- Klein Tools 56005 - 15m Fibreglass Fish Tape
- Starrett Bi-Metal Dual Tooth - Hole Saw Set
- Clipsal 261/20 - 20mm Conduit Bending Spring
⚡ Safe shed wiring guide for lights and power in Australia
What are the key considerations for safely wiring a shed in Australia?
Wiring a shed for lighting and power involves planning the load, selecting the correct cable route and protection devices, and ensuring the installation complies with AS/NZS 3000 Wiring Rules and local supply requirements. For most Australian sheds, this means a subcircuit or submain from the house switchboard, suitable underground or above-ground cable protection, correct earthing, and RCD protection for all final subcircuits.
Electrical work in Australia must be performed by a licensed electrician. This guide is for understanding the process and selecting the right tools and materials.
What skill level is required for wiring a shed for lights and power in Australia?
Advanced — Estimated time: 1-2 days for planning and rough-in, plus testing and certification by a licensed electrician
What essential tools are needed for wiring a shed for lights and power in Australia?
What specific materials are required for wiring a shed in Australia?
Safety Requirements
Step-by-Step Guide
Step 1: Plan the shed layout and electrical load
Start by deciding how the shed will be used: storage, workshop, home office or mixed use. This determines the number of lights, power points and any high-load equipment such as welders, compressors, fridges or EV charging equipment.
Mark the position of:
Calculate the likely load so the correct circuit arrangement can be selected. A basic storage shed may only need one lighting circuit and one power circuit, while a workshop may justify a small sub-board with separate circuits.
💡 Leave room for future expansion. It is often worth installing an extra conduit or a slightly larger submain during the first fit-out.
Step 2: Decide whether the shed needs a single circuit or a sub-board
For a small shed close to the house, a single dedicated circuit may be enough. For larger sheds, long cable runs, or multiple loads, a sub-board in the shed is often the better option.
A shed sub-board is commonly the best choice when:
Typical cable sizes for discussion with your electrician may include 4mm², 6mm² or 10mm² TPS for the submain, but exact sizing must be based on demand, installation method, fault current and voltage drop calculations under AS/NZS 3000.
Step 3: Choose the cable route and wiring method
There are usually two main routes to a detached shed:
Underground routeThis is the neatest and most common solution. Cable is installed in heavy-duty conduit with appropriate burial depth and mechanical protection. Warning tape should be installed above the conduit in the trench.
Above-ground routeThis may be possible between structures using catenary support systems or suitable protected wiring methods, but clearance, mechanical support and exposure must be carefully assessed.
Inside the shed, cables are typically run:
In metal sheds, extra care is needed around sharp edges, gland entries and earthing/bonding requirements.
Step 4: Confirm protection devices and switchboard capacity
Check whether the house switchboard has:
For most modern installations, using RCBOs provides both overload and residual current protection per circuit. If the shed has its own sub-board, the arrangement must be coordinated so nuisance tripping and discrimination issues are minimised.
This is also the stage to confirm whether surge protection is worthwhile, especially for home office sheds or workshops with expensive tools.
Step 5: Install the submain or supply cable to the shed
Once the route and cable size are confirmed, the supply cable is run from the main switchboard to the shed.
For underground runs:
For above-ground runs:
Where the shed is metal-clad, all entries should be bushed or glanded to prevent cable damage.
Step 6: Install the shed sub-board or final circuit termination
If a sub-board is used, mount it in a dry, accessible location inside the shed. Keep it away from likely impact zones, excessive dust, or direct weather.
The sub-board may contain:
If only one final circuit is being supplied, terminate the circuit at the first accessory or isolation point in accordance with the design. Labelling at the main switchboard and shed is important so the supply can be identified quickly.
Step 7: Rough-in lighting and power circuits
Run the internal circuits to the planned locations.
Typical arrangements:
Mount power points at practical heights. In workshops, higher GPOs above benches reduce lead clutter. Space outlets to avoid over-reliance on power boards.
For lighting:
In exposed or unfinished sheds, surface conduit is often the cleanest and most durable method. It also makes future alterations easier.
Step 8: Install switches, lights and socket-outlets
Fit accessories once the rough-in is complete.
For lights:
For power:
Check that all terminations are firm, conductors are fully inserted, and no copper is exposed beyond terminals.
Step 9: Earthing, bonding and mechanical protection checks
Before testing, confirm:
Metal sheds can present extra fault risks if earthing or bonding is poor. This step is critical for shock protection.
Step 10: Test, verify and label the installation
The completed installation must be tested by a licensed electrician before energisation.
Testing typically includes:
All circuits should be clearly labelled at the switchboard or sub-board, for example:
This helps with future maintenance and emergency isolation.
Step 11: Energise and check real-world use
After certification and energisation, confirm the installation performs as intended:
💡 A final walk-through at night is useful to check lighting levels, shadows and switch convenience.
Common Mistakes to Avoid
Pro Tips
Recommended Tools
⚠️ Safety
🔒 Licensing
Electrical wiring, circuit installation, switchboard alterations, and final connections in Australia require a licensed electrician. State regulators include NSW Fair Trading, VIC ESV, QLD ESO, and WA EnergySafety. Compliance with AS/NZS 3000 and applicable service and installation rules is mandatory.
Frequently asked questions
- What size cable do I need to run power to a shed?
- Most domestic shed installations require a 6mm² or 10mm² two-core and earth XLPE or TPS copper cable running from the main switchboard. The exact conductor size depends on the total maximum demand, run distance, and compliance with AS/NZS 3000 voltage drop limits, which must not exceed 5% at the shed outlets.
- How deep must an underground electrical conduit be buried in Australia?
- Under AS/NZS 3000:2018, heavy-duty rigid PVC electrical conduit must be buried at a minimum depth of 500mm in residential ground. If installed under concrete or subject to vehicular traffic, depth requirements increase to 600mm. An approved orange electrical marker warning tape must also be laid at least halfway above the conduit.
- Does a shed need its own sub-board and earth stake?
- Installing a local distribution board in the shed is recommended if running multiple lighting and power circuits or heavy workshop machinery. Under AS/NZS 3000, if the shed is treated as a separate outbuilding with a submain distribution board, an independent Men system earth electrode must generally be installed to ensure fault protection.
- Can I legally wire my own shed in Australia?
- No, non-licensed DIY electrical work is illegal across all Australian states and territories under national electrical safety legislation. Homeowners and handymen may complete trenching and mechanical preparation where permitted, but a licensed electrical contractor must select cables, pull conductors, terminate circuits, conduct testing, and submit a Certificate of Electrical Safety.
- What protection devices are required for shed circuits?
- All shed light and power subcircuits must be protected by 30 milliampere Residual Current Devices or combination RCBOs compliant with AS/NZS 3000:2018. The submain feeding the shed sub-board must also be protected at the primary switchboard by an appropriately sized miniature circuit breaker matching cable current-carrying capacity.
- What IP rating is required for shed power points and switches?
- Unsealed or open-sided workshop sheds require fittings rated to at least IP56 to resist ambient moisture and fine airborne dust ingress. For fully enclosed, dry domestic sheds, standard IP2X or IP4X switches and sockets are acceptable, though IP66 weatherproof gear is best practice near roller doors and wash-down areas.